OurPortfolio
 
 
Customer : PT. Huawei Indonesia
Project : NPM EJ Huawei
Area : East Java
Sow : RF Engineer & Drive Test Support :
• Bi-Weekly regular cluster DT
• Monthly regular cluster benchmark DT
• Network Coverage Optimization (Physical Tuning)
• DT Reporting
• VIP request support
Desc : • Responsible for Regular DT footprint data around the regions
• Total Ramp Up Team (2 RF Engineers, 7 DT Engineers, 5 Riggers)
 oct 
2015
 oct 
Customer : PT. Immobi Solusi Prima
Project : Telkomsel TrueBEX Program
Area : East Java
Sow : Drive Test -CET Support :
• Weekly regular cluster DT
• Monthly regular cluster benchmark DT
• Daily Customer Experience Test on Telkomsel POI
• Network Coverage Optimization (Physical Tuning)
• DT Reporting
• CET result reporting
• VIP request support
Desc : • Responsible for Regular DT footprint data & Customer Experience Report around the regions
• Total City: BBC 6 City (Surabaya), 3 BBC 24 Cities (Malang, Jember, Pasuruan)
• Total Ramp Up Team (1 Project Coordinator, 4 CET/ Walktest Engineers, 5
DT Engineers, 5 Riggers)
  sep sep  
Customer : PT. Telkomsel East Java
Project : Telkomsel in-house "Swadaya Project"
Area : East Java
Sow : Pre/Post Launch Optimization :
• PES/ROC Creation
• OSS Database Creation
• Network Integration
• Site Verification DT
• KPI Improvement to meet determined treshold
Desc : • Responsible for Database preparation of Newsite Integration around the regions
• Team Up with other parties which responsible for Network Integration part
• Total Site: 59 (2G) Batch-1, 202 sites on going (Batch-2)
• Total Ramp Up Team (1 Project Coordinator, 1 OSS Integrator Engineer, 2
BSC / RNC Integrator Engineers, 2 PLO Engineers, 2 Site Verification DT Engineers)
aug aug  
  jul jul  
  jun jun  
  may may  
  apr apr  
  mar mar  
  feb feb  
  jan jan  
  dec
2014
dec  
  nov nov  
  oct oct  
  sep sep
Customer : PT. Telkomsel Papua-Maluku
Project : Telkomsel in-house "Swadaya Project"
Area : Papua-Maluku
Sow : Pre/Post Launch Optimization :
• PES/ROC Creation
• OSS Database Creation
• Network Integration
• KPI Improvement to meet determined treshold
Desc : • Responsible for Database preparation of Newsite Integration around the regions
• Team Up with other parties which responsible for Network Integration part
• Total Site: 103 (2G)
• Total Ramp Up Team (1 Project Coordinator, 1 OSS Integrator Engineer, 2
PLO Engineers)
  aug aug  
  jul jul  
  jun jun  
  may may  
Customer : PT. Telkomsel Kalimantan
Project : Telkomsel in-house "Swadaya Project"
Area : Kalimantan
Sow : Pre/Post Launch Optimization :
• PES/ROC Creation
• OSS Database Creation
• Network Integration
• Site Verification DT
• KPI Improvement to meet determined treshold
Desc : • Responsible for Database preparation of Newsite Integration around the regions.
• Team Up with other parties which responsible for Network Integration part.
• Total Site: 187 (2G), 46 (3G)
• Total Ramp Up Team (1 Project Coordinator, 1 OSS Integrator Engineer, 2
BSC / RNC Integrator Engineers, 2
PLO Engineers, 2 Site Verification DT Engineers)
apr apr  
  mar mar  
  feb feb  
  jan jan  
  dec
2013
dec  
  nov nov  
  oct oct
Customer : PT. Nexwave
Project : Nokia -Indosat, MBS Program
Area : East Kalimantan
Sow : RF Survey :
•Geotagging
• Hardware & RF Tagging
• Antenna Configuration Data Filling
• Reporting
Desc : • Responsible for Site Audit Survey in Inner Balikpapan & Penajam
• Total Sites: 89 Sites (2G & 3G)
• Total Ramp Up Team (1 Project Coordinator, 6 RF Survey Engineers)
  sep sep  
  aug aug  
  jul jul  
  jun jun  
  may may  
  apr apr  
  mar mar  
  feb feb  
  jan jan  
  dec
2010
dec  
  nov nov  
Customer : PT. Nexwave
Project : Huawei -HCPT Roll Out Project
Area : East Java
Sow : Total Site Survey / TSS for Newsite :
• Geotagging
• Transmission Loss Survey
• GPS Tracking
• CME Survey
• Reporting
Desc : • Responsible for TSS Survey in area East Java
• Total Sites: 312 Sites (2G & 3G)
• Total Ramp Up Team (4 Project Coordinators, 12 RF Survey Engineers)
oct oct  
  sep sep  
  aug aug  
  jul jul  
  jun jun  
  may may  
  apr apr
Customer : PT. Nexwave
Project : NSN -Indosat FOC Maintenance Project
Area : East Java
Sow : Site Audit Survey / SAS :
• Geotagging
• HW & RF Tagging
• Antenna Config Data Filling
• Reporting
Desc : • Responsible for Site Audit Survey in area Inner Surabaya & Southern East Java
• Total Sites: 75 Sites (2G & 3G)
• Total Ramp Up Team (1 Project Coordinator, 6 SAS Survey Engineers)